Construction begins on Lightsource bp’s 13-MW California solar project

Lightsource bp has mobilized construction on its Wildflower Solar project located in Rio Linda, about 10 miles north of Sacramento, California. All of the electricity generated by the 16.5-MWdc/13-MWac project, enough to power about 2,600 homes, will be purchased by the Sacramento Municipal Utility District (SMUD) through a long-term power contract. SMUD is one of…

The post Construction begins on Lightsource bp’s 13-MW California solar project appeared first on Solar Power World.

Share this post

Share on facebook
Share on google
Share on twitter
Share on linkedin
Share on pinterest
Share on print
Share on email

Appointment Form