Development underway on 150-MW Indiana solar project following PPA from electric cooperative

Energy and transmission cooperative Hoosier Energy signed a 150-MW power purchase agreement (PPA) on the Ratts 2 Solar Project, owned by Capital Dynamics CEI, located in Knox County, Indiana. Arevon Energy Management and Tenaska are co-developing this project, and construction is expected to begin in 2022 with commercial operation anticipated in 2023. “Hoosier Energy’s PPA…

The post Development underway on 150-MW Indiana solar project following PPA from electric cooperative appeared first on Solar Power World.

Share this post

Share on facebook
Share on google
Share on twitter
Share on linkedin
Share on pinterest
Share on print
Share on email

Appointment Form