SWEPCO Looking to Add 300 MW of Solar Inside Territory

Southwestern Electric Power Co. (SWEPCO), a subsidiary of American Electric Power (AEP), has issued three requests for proposals for renewable and short-term generating capacity.

The RFPs solicit bids for the purchase of solar resources up to 300 MW, wind resources of up to 3 GW,  and short-term accredited deliverable capacity up to 250 MW.

Wind resources must be a minimum of 100 MW, interconnect to the Southwest Power Pool (SPP) and be located in Arkansas, Louisiana, Texas, Oklahoma, Kansas or Missouri.

Solar resources must be a minimum of 50 MW, interconnect to SWEPCO’s transmission system within SPP and be located in the SWEPCO service territory.

Proposals for short-term capacity must be for a minimum of 50 MW from SPP resources.

Proposals are due by Aug. 12. Response and contact information is available here.

The post SWEPCO Looking to Add 300 MW of Solar Inside Territory appeared first on Solar Industry.

Share this post

Share on facebook
Share on google
Share on twitter
Share on linkedin
Share on pinterest
Share on print
Share on email

Appointment Form